REMIT Transparency Platform

This page is the primary source for the publication of inside information (as defined in REMIT) in relation to Ennatuurlijk’s power and heat production units.

This information has been provided by Ennatuurlijk to comply with Article 4 of Regulation (EU) No 1227/2011 of the European Parliament and of the Council of 25 October 2011 on wholesale energy market integrity and transparency (REMIT).

Facility Location Control Area Installed Capacity Fuel Availability
Eindhoven 1 Eindhoven GTS 27 MW Gas Online
Eindhoven 2 Eindhoven GTS 27 MW Gas Online
Eindhoven 3 Eindhoven GTS 27 MW Gas Online
Helmond 1 Helmond Tennet/GTS 25 MW Gas Online
Helmond 2 Helmond Tennet/GTS 25 MW Gas Online
Ketelhuis Amer Geertruidenberg GTS 170 MW Gas Online

Latest Updates

Time published Facility Start event End event Planned​/​Unplanned Installed Capacity Available capacity Message End date
Helmond 1 08-27-2018 11:25 28-08-2018 17:00 Unplanned unavailability 25 MW 0 MW Unplanned maintenance -
Helmond 2 03-12-2018 07:30 12-03-2018 23:00 Unplanned unavailability 25 MW 0MW Unplanned outage -
Helmond 1 12-08-2017 07:00 08-12-2017 11:00 Planned unavailability 25 MW 0 MW Planned maintenance -
Helmond 2 12-06-2017 19:00 07-12-2017 07:00 Unplanned unavailability 25 MW 0 MW Unplanned maintenance -
Helmond 2 12-06-2017 11:00 06-12-2017 19:00 Planned unavailability 25 MW 0 MW Planned maintenance -
Helmond 2 11-30-2017 12:46 30-11-2017 15:51 Unplanned unavailability 25 MW 0 MW expected Error Stop -
Helmond 1 11-17-2017 05:00 17-11-2017 07:20 Unplanned unavailability 25 MW 13 MW Offline due to trip -
Helmond 2 11-03-2017 13:50 20-11-2017 16:00 Unplanned unavailability 25 MW 0 MW Unplanned maintenance -
Helmond 2 10-24-2017 06:21 02-11-2017 11:47 Unplanned unavailability 25 MW 0 MW expected Unplanned maintenance -
Helmond 2 10-13-2017 06:00 13-10-2017 10:00 Unplanned unavailability 25 MW 18.5 MW expected Offline due to trip -
Helmond 2 09-08-2017 09:06 08-09-2017 11:20 Unplanned unavailability 25 MW 0 MW expected Offline due to trip -
Helmond 2 09-04-2017 16:00 04-09-2017 16:07 Unplanned unavailability 25 MW 0 MW expected Offline due to trip -